How do ADU permits work in Los Angeles?

Every ADU needs a building permit. State law gives the city 60 days to decide on a complete application.

Last updated:

Do I need a permit to build an ADU in Los Angeles?

Yes. Every ADU in the City of Los Angeles needs a building permit from the Department of Building and Safety (LADBS). The city regulates ADUs under Municipal Code Section 12.22 A.33, adopted as Ordinance 186,481 and in effect since December 19, 2019, alongside California's state ADU law.

How long does an ADU permit take?

State law requires the city to approve or deny a complete ADU application within 60 days. If the city does not act in that time, the application is deemed approved. In practice, our own submissions to LADBS are approved in about 6 weeks, because we design to the code from day one.

Permit timing for an ADU
StepTimingSource
City decision on a complete application60 days at mostGov. Code § 66317
No decision within 60 daysApplication deemed approvedGov. Code § 66317
Our average LADBS approvalAbout 6 weeksSiboni Development & Design

What is the LADBS Standard Plan Program?

It is a catalog of ADU designs that LADBS has pre-approved against the building, residential and green codes. When a project uses a standard plan, reviewers only check what is specific to the property, such as zoning and foundations. Plan check is shorter and permits are issued more quickly.

Are there lots where an ADU is harder to permit?

Yes. Under the city ordinance, lots located in both a Hillside Area and a Very High Fire Hazard Severity Zone must meet additional conditions, such as fire sprinklers, an on-site parking space and a street at least 20 feet wide. We check the zoning that applies to your lot during the site assessment.

Can an existing unpermitted unit be legalized?

Often, yes. State law limits a city's ability to deny a permit for an unpermitted ADU built before January 1, 2020, and LADBS publishes a streamlined process for these units. Corrections needed for health and safety can still be required, so each unit has to be inspected first.

Who handles the permit?

We do. Siboni Development & Design manages the entire city permit process as part of every project. It is one of the five steps covered by a single contract, with one point of contact from the first site visit to the final inspection.

Sources

Sources checked on . General information, not legal or financial advice. Rules change and each city applies its own standards: we confirm what applies to your lot during the free site assessment.